11 Feb · 5 minutes min
Increased Availability Leads to Significant Additional Throughput

Increased Availability Leads to Significant Additional Throughput
The Challenge
A major mining operation faced fluctuating maintenance KPIs and unreliable availability of bottleneck equipment, constraining throughput and operational efficiency. The need for a data-driven, cross-functional solution was clear.
Our Solution
Using Falconi’s Asset Reliability & Management system, we deployed a step-by-step approach:
- Define strategic maintenance goals and align them with shop floor operations.
- Perform ABC asset analysis and assess current Asset Reliability.
- Develop integrated plans: Maintenance Engineering, Planning & Control, Execution.
- Train operational teams for successful rollout.
- Monitor performance and execute fast-response countermeasures for deviations.
Key Objectives
- Connect critical production KPIs to open-pit operations.
- Engage all functional areas: Operations, Maintenance, Contractors, Technical Support, Planning.
- Identify availability drivers (e.g., blackouts, overheating, human error).
- Implement forecasts and action plans based on deviation analysis.
- Track savings from reliability improvement initiatives.
Results
- ✅ +4.6% availability increase for bottleneck equipment.
- 📉 Reduced KPI variability, signaling better process control.
- 💡 Forecasted savings tracked across specific initiatives.
- 📈 KPI performance improved month-over-month following two key interventions.
Impact: Improved availability directly enhanced production throughput — without extra capital investment.
Why It Worked
- Structured problem-solving using data and cross-functional collaboration.
- Real-time monitoring of maintenance KPIs.
- Actionable insights leading to timely corrective plans.
📘 Conclusion
This case proves that targeted improvements in equipment availability can unlock substantial hidden throughput. Falconi's integrated approach enabled sustainable gains, enhanced accountability, and long-term value.

